Sign in to follow this  
Followers 0
Kevin OBrien

In The Lab: Eaton 5PX & EBM Battery Replacement Discussion

1 post in this topic

In the StorageReview Enterprise Lab we use a variety of power management tools and battery backups. If a data center is not generating their own power or has sufficient backup generators, an interruption in power supply is inevitable (in the cases above, interruptions are still a possibility). For our testing environments we use Eaton gear from 5PX UPS  for managing a subset of systems up to the BladeUPS and its ability to power several racks. The 5PX UPS has been running in our lab for over 5 years and the time has finally come to perform some scheduled maintenance on it and the connected EBM (Extended Battery Module). In this In the Lab we go over the steps required to swap out the batteries in the UPS and replace the EBM.

In The Lab: Eaton 5PX & EBM Battery Replacement

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!


Register a new account

Sign in

Already have an account? Sign in here.


Sign In Now
Sign in to follow this  
Followers 0